Photograph of aerial view of Alcan Smelter and Douglas Channel. The Channel is in the front, and smelter behind it. Potlines look completed and smoke is coming up from them. Snowy mountains in backround.
From the years 1953-1958, Mike Kinnear took photos during his school years, until graduation, while working for Fred Ryan Ltd. after school and holidays. Photos for him was a hobby, and he took many photos of the smelter and townsite as it grew around him. Mike also took a number of photos for the Kitimat Northern Sentinel, during the Ken Brumley and Pixie Meldrum years as editors. Mike and his family left Kitimat in 1958, but he spent the best part of 40 years in the photographic field, mainly in the retail/wholesale part of the photo industry.
Custodial History
Donated by Margaret and Mike Kinnear.
Scope and Content
Photograph of aerial view of Alcan Smelter and Douglas Channel. The Channel is in the front, and smelter behind it. Potlines look completed and smoke is coming up from them. Snowy mountains in backround.
Photograph of Smelter Pot Lines. On back reads 'Pot Rooms One A,B,&C (r to l). These threee pot rooms comprise one pot line. There are two such pot lines nearing completion. When the project is completed there will be 8 pot lines or in other words 24 pot rooms, each 1200 feet long.'
Photograph of Smelter Pot Lines. On back reads 'Pot Rooms One A,B,&C (r to l). These threee pot rooms comprise one pot line. There are two such pot lines nearing completion. When the project is completed there will be 8 pot lines or in other words 24 pot rooms, each 1200 feet long.'
Photocopied documents relating to John McLachlan's employment with Alcan.
1) Letter of employment, G. W. Whitehead (Alcan) to John McLachlan, offering position as Draughtsman in Kitimat. April 10th 1953
2) Letter of acceptance, John McLachlan to G.W. Whitehead. April 11th 1953
3) Alcan Personnel Department introduction form, to Mr. G. T. Malby, Resident Engineer, May 13th 1953
4) Invitation to join Retirement Income and Life Insurance Plan, Ian Maclean to John McLachlan, June 23rd 1954.
5) Account of duties as Senior Draughtsman, John McLachlan to W. H. Sparks, September 11th 1956.
John McLachlan arrived in Kitimat in 1953 as a 23-year-old immigrant and went on to work at Alcan's Property Engineering Department for almost 40 years. He started out as a land surveyor and cartographer in the town's early years and ended his career as a Senior Legal Draftsmen.
Custodial History
Donated by Jean Lunny, January 12th 2018
Scope and Content
Photocopied documents relating to John McLachlan's employment with Alcan.
1) Letter of employment, G. W. Whitehead (Alcan) to John McLachlan, offering position as Draughtsman in Kitimat. April 10th 1953
2) Letter of acceptance, John McLachlan to G.W. Whitehead. April 11th 1953
3) Alcan Personnel Department introduction form, to Mr. G. T. Malby, Resident Engineer, May 13th 1953
4) Invitation to join Retirement Income and Life Insurance Plan, Ian Maclean to John McLachlan, June 23rd 1954.
5) Account of duties as Senior Draughtsman, John McLachlan to W. H. Sparks, September 11th 1956.
General view of the site looking north showing the Smelter at upper centre, and the Graving Dock and Wharf at lower centre. Taken from a helicopter on Wednesday, April 1, 1953.
General view of the site looking north showing the Smelter at upper centre, and the Graving Dock and Wharf at lower centre. Taken from a helicopter on Wednesday, April 1, 1953.
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Notes
Title based on content of photograph. Alcan Collection 79.31.7
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photograph of U.S. Newsmen visited Alcan's smelter Saturday night. Shown above with works manager Gerry Gwyn and electrical maintenance supervisor Carl Dumka are James Dayle, North America Newspaper Alliance, Mr. Gwyn, Miles Peebles, New York Herald- Tribune, Robert Koehler, Christian Science Monitor, Arthur Friedman (wearing hat), Financial editor of the Pittsburgh post-Gazette, Mr. Dumka, Leroy Pope, United Press International, and Richard Larkin, Buisiness week.
Photograph of U.S. Newsmen visited Alcan's smelter Saturday night. Shown above with works manager Gerry Gwyn and electrical maintenance supervisor Carl Dumka are James Dayle, North America Newspaper Alliance, Mr. Gwyn, Miles Peebles, New York Herald- Tribune, Robert Koehler, Christian Science Monitor, Arthur Friedman (wearing hat), Financial editor of the Pittsburgh post-Gazette, Mr. Dumka, Leroy Pope, United Press International, and Richard Larkin, Buisiness week.