Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Illustration depicts the extent of the Project, from the Kenney Dam and reservoir area to the transmission line and smelter. The future tunnel or the Kemano Completion Project is also included.
Illustration depicts the extent of the Project, from the Kenney Dam and reservoir area to the transmission line and smelter. The future tunnel or the Kemano Completion Project is also included.
Notes
Illustration from Alcan's publication "Kitimat-Kemano, Five Years of Operation, 1954-1959". Alcan Collection