Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
This tag was made by Alcan Aluminum and is 25x57 cm. One side has a line drawing of ingots being loaded on a ship. The reverse side has an imprinted sign saying Kitimat works.
This tag was made by Alcan Aluminum and is 25x57 cm. One side has a line drawing of ingots being loaded on a ship. The reverse side has an imprinted sign saying Kitimat works.