Skip header and navigation

Revise Search

2 records – page 1 of 1.

Carl Agar and Bill McLeod with Sikorsky helicopter

https://collections.kitimatmuseum.ca/en/permalink/description13
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
[ca. 1950s]
Scope and Content
Photo depicts Carl Agar looking up at Bill McLeod who is piloting a Sikorsky helicopter.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
7
GMD
graphic material
Date Range
[ca. 1950s]
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts Carl Agar looking up at Bill McLeod who is piloting a Sikorsky helicopter.
Notes
Fourteen Sikorsky S-55 helicopters were used as workhorses and load carriers during construction. Carl Agar and his crew with Okanagan Helicopters took men and materials to otherwise inaccessible spots. Without these helicopters, Project engineers would never have maintained the construction schedule. Photographed by Art Hundert. Kitimat Heritage Advisory Commission Collection
Name Access
Agar, Carl
McLeod, Bill
Subject Access
Okanagan Helicopters
Images
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
GMD
graphic material
Date Range
[2 July 1969]
Accession Number
2005.8.8533
Scope and Content
Photograph of the Granduc Mine, 32 miles from Stewart, was viewed last Friday by Joe Banyay of Kitimat and the other directors of Skeena "B" Regional District. Construction, which involves an 11 and a half mile tunnel though solid rock to the main ore body, has been practically halted since February over a labour dispute. The towns population is now fast slipping from it's winter high of 750 as workmen move away.
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
Accession Number
2005.8.8533
GMD
graphic material
Date Range
[2 July 1969]
Physical Description
1 photograph : b&w ; 15 x 18 cm
Scope and Content
Photograph of the Granduc Mine, 32 miles from Stewart, was viewed last Friday by Joe Banyay of Kitimat and the other directors of Skeena "B" Regional District. Construction, which involves an 11 and a half mile tunnel though solid rock to the main ore body, has been practically halted since February over a labour dispute. The towns population is now fast slipping from it's winter high of 750 as workmen move away.
Name Access
Banyay, Joe