Skip header and navigation

Revise Search

2 records – page 1 of 1.

Bill Frahler's truck and family

https://collections.kitimatmuseum.ca/en/permalink/description176
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
1954
Scope and Content
Photo depicts Electrician Bill Frahler's family standing beside his truck. Johnson-Crooks houses under construction in Nechako Neighbourhood are in the background.
Part Of
Kitimat Museum Website Collection
Creator
Bill Frahler
Description Level
Item
Item Number
170
GMD
graphic material
Responsibility
Bill Frahler
Date Range
1954
Physical Description
1 slide : col.
Scope and Content
Photo depicts Electrician Bill Frahler's family standing beside his truck. Johnson-Crooks houses under construction in Nechako Neighbourhood are in the background.
Notes
Title based on content of photograph. -- "Alva and the Boys", Slide No. 95 -- Bill Frahler wired over 2,000 temporary construction and permanent homes between 1954 and 1958, first working for Johnson-Crooks and then Straits Construction. Bill Frahler Collection 2003.32
Name Access
Frahler, Bill
Subject Access
Towns
Images

International L-190 concrete truck fleet

https://collections.kitimatmuseum.ca/en/permalink/description143
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Scope and Content
Photo depicts seven International L-190 trucks, complete with Jaeger ready-mix concrete machines. These trucks were the first installment of a large fleet at Kitimat.
Part Of
Kitimat Museum Website Collection
Creator
International Harvester Company
Description Level
Item
Item Number
137
GMD
graphic material
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts seven International L-190 trucks, complete with Jaeger ready-mix concrete machines. These trucks were the first installment of a large fleet at Kitimat.
Notes
Title based on content of photograph. -- International Harvester Company No. C 6101. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. -- In early July these trucks were waiting for the completion of the batching plant installation. The trucks carried concrete directly to the new smelter in the townsite and assisted in all other town and smelter construction. -- The batch plant was located at "Gravel Mountain" - the sandhill. Hal Whiting Collection 985.65.107
Subject Access
Smelters
Images