Photo showing Perfect Score, 450, Bowled. Bill Harkness, operator of the Dairy Plant, Crawley McCracken Co. Kemano has rolled up twelve strikes on the Kemano Recreation Association Alleys at an open Bowling session. Bill, although not one of the high average bowlers of the community is an enthusiastic league bowler and has proven that with perserverance the elusive 450 can be rolled.
The Kemano Alleys were installed a year ago by National Bowling and Billiards of Vancouver and are considered to be one of the best set of lanes in the Province.
The Kemano Recreation Association purchased the Alleys which are installed in a building remodelled by Alcan for the purpose. Bowling has now become the No. 1 sport of the Kemano residents.
Photo showing Perfect Score, 450, Bowled. Bill Harkness, operator of the Dairy Plant, Crawley McCracken Co. Kemano has rolled up twelve strikes on the Kemano Recreation Association Alleys at an open Bowling session. Bill, although not one of the high average bowlers of the community is an enthusiastic league bowler and has proven that with perserverance the elusive 450 can be rolled.
The Kemano Alleys were installed a year ago by National Bowling and Billiards of Vancouver and are considered to be one of the best set of lanes in the Province.
The Kemano Recreation Association purchased the Alleys which are installed in a building remodelled by Alcan for the purpose. Bowling has now become the No. 1 sport of the Kemano residents.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.