Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Lakelse lake Mudslide. Tangled mass of mud, sand and trees cover area that was part of new section of Kitimat - Terrace highway until Friday evening. Major slide about a mile long and half-mile wide completely wiped road communication between the two communities as well as ripping out transmission line carrying power from kemano and Kitimat to Terrace. Downed and twisted power lines are visible at centre of photo Two cars, almost standing on their noses (circled), remain on portion of obliterated road.
Lakelse lake Mudslide. Tangled mass of mud, sand and trees cover area that was part of new section of Kitimat - Terrace highway until Friday evening. Major slide about a mile long and half-mile wide completely wiped road communication between the two communities as well as ripping out transmission line carrying power from kemano and Kitimat to Terrace. Downed and twisted power lines are visible at centre of photo Two cars, almost standing on their noses (circled), remain on portion of obliterated road.