This item is part of a large collection of photographs from Prince Rupert Daily News that was first transfered to the Prince Rupert City & Regional Archives. Images pertaining to Kitimat/Kemano were subsequently transfered to our repository.
Scope and Content
Photograph of bundles of aluminum cylinder ingots.
Photo depicts one of four "Mallard" amphibian airplanes with Pacific Western Airlines that was used to transport personnel and freight between Vancouver, Kemano and Kitimat.
Photo depicts one of four "Mallard" amphibian airplanes with Pacific Western Airlines that was used to transport personnel and freight between Vancouver, Kemano and Kitimat.
Notes
Title based on content of photograph. -- Alcan ID No. 5793. Alcan Collection
Photo depicts two men kneeling beside the first bags of mail to arrive via Pacific Western Airlines. On the right, Captain T. M. Kellough for PWA delivers the bags to on the left, Kitimat Express driver Lloyd Kaberg, at the wharf, Smeltersite. Northern Sentinel Press Collection
Photo depicts two men kneeling beside the first bags of mail to arrive via Pacific Western Airlines. On the right, Captain T. M. Kellough for PWA delivers the bags to on the left, Kitimat Express driver Lloyd Kaberg, at the wharf, Smeltersite. Northern Sentinel Press Collection
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.