Skip header and navigation

Revise Search

2 records – page 1 of 1.

Remembrance Day ceremony

https://collections.kitimatmuseum.ca/en/permalink/description284
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
November 11, 1958
Scope and Content
Photo depicts a Remembrance Day ceremony underway in Nechako Theatre in Kitimat. The Volunteer Firefighter's wreath is laid by Fire Chief Aubrey Creed. On the stage from the left are Reverend Graham Tucker, Dr. R. G. Davidson, and A. E. Vrooman, colour bearer of the Canadian Legion.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
278
GMD
graphic material
Date Range
November 11, 1958
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts a Remembrance Day ceremony underway in Nechako Theatre in Kitimat. The Volunteer Firefighter's wreath is laid by Fire Chief Aubrey Creed. On the stage from the left are Reverend Graham Tucker, Dr. R. G. Davidson, and A. E. Vrooman, colour bearer of the Canadian Legion.
Notes
Title based on content of photograph. -- Northern Sentinel Press article, November 13, 1958. -- A. E. "Dutch" Vrooman worked for Kitimat Constructors on the original survey for the Kitimat townsite and smelter. Northern Sentinel Press Collection
Name Access
Tucker, Reverend Graham
Davidson, Dr. R. G.
Vrooman, A. E.
Subject Access
Ceremonies
Images

Tent with flat-top house assembly

https://collections.kitimatmuseum.ca/en/permalink/description222
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
ca. 1956
Scope and Content
Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Part Of
Kitimat Museum Website Collection
Creator
Bill Frahler
Description Level
Item
Item Number
216
GMD
graphic material
Date Range
ca. 1956
Physical Description
1 slide : col.
Scope and Content
Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Notes
Title based on content of photograph. -- Slide No. 40 -- The circus tent assembly line was erected at Vancouver Tug and Barge below the Lion's Gate Bridge. Temporary housing destined for Kitimat was assembled there in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Bill Frahler Collection 2003.32
Subject Access
Construction of Buildings
Images