Photo showing view looking west, centre foreground: forms in place for sheet piling for east piers, right foreground: first and second cribs of east and temporary bridge, centre background: right sheet piling center piers all placed, left-western cribs and deck for temporary bridge being placed.
Photo showing view looking west, centre foreground: forms in place for sheet piling for east piers, right foreground: first and second cribs of east and temporary bridge, centre background: right sheet piling center piers all placed, left-western cribs and deck for temporary bridge being placed.
Photo showing brdge site looking west from east bank of Kitimat River, forms for east piers being placed, immediate foreground, guides for sheey piling in place for centre piers, centre background, first piece of sheet piling in place.
Photo showing brdge site looking west from east bank of Kitimat River, forms for east piers being placed, immediate foreground, guides for sheey piling in place for centre piers, centre background, first piece of sheet piling in place.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Possible farewell to someone. Man in white cap and naval suit carring a mock suitcase. Percy Radley (with pipe?), in doorway, Dale Madill and Jack Kendrick. Fellow in profile - Cronk, first postmaster
Possible farewell to someone. Man in white cap and naval suit carring a mock suitcase. Percy Radley (with pipe?), in doorway, Dale Madill and Jack Kendrick. Fellow in profile - Cronk, first postmaster
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.