Photo showing Carbon Paste Plant area looking north-east showing progress of deep foundations and start of building footings, compressor foundation and column footings for compressor building 140 in foreground.
Photo showing Carbon Paste Plant area looking north-east showing progress of deep foundations and start of building footings, compressor foundation and column footings for compressor building 140 in foreground.
Photo showing inside of Casting building, on left is conveyor shute, conveyor for ingots and table for ingots to be stacked and wrapped for shipping on the right, holding bay.
Photo showing inside of Casting building, on left is conveyor shute, conveyor for ingots and table for ingots to be stacked and wrapped for shipping on the right, holding bay.
Photo showing view looking north east at east caisson, inner bulkhead being lifted into place near south end of caisson and trusses being fabricated in front of caisson at far end.
Photo showing view looking north east at east caisson, inner bulkhead being lifted into place near south end of caisson and trusses being fabricated in front of caisson at far end.