Photograph of the Canadian National Railways. Its the first train over CNR line linking Terrace with Kitimat. The man in the photo with crutches name is Mr. George little, he is a Terrace Pioneer. From left to right is A.W. (Dutch) Turney- the Alcan Mor. George Malby- the Alcan Resident engineer, and Mr. G Melrose
Photograph of the Canadian National Railways. Its the first train over CNR line linking Terrace with Kitimat. The man in the photo with crutches name is Mr. George little, he is a Terrace Pioneer. From left to right is A.W. (Dutch) Turney- the Alcan Mor. George Malby- the Alcan Resident engineer, and Mr. G Melrose
Photo showing "Opening of the Royal Bank of Canada, 1st Bank in Service Centre". Office in Kitimat Builders Supply; 1st business to open in Service Centre. L/R Jack Hilts, Manager; Reeve Will Sparks; E.D. Don Forward, Manager of Kitimat Builders; George Malby, Alcan Resident Engineer; ??; J.T. Madill, Alcan Power Engineer; Norm Bradshaw, Bank Accountant; Larry Ecroyd, Northern Sentinel.
#2: Northern Sentinel: Box #2: Heritage Files - Royal Bank
Scope and Content
Photo showing "Opening of the Royal Bank of Canada, 1st Bank in Service Centre". Office in Kitimat Builders Supply; 1st business to open in Service Centre. L/R Jack Hilts, Manager; Reeve Will Sparks; E.D. Don Forward, Manager of Kitimat Builders; George Malby, Alcan Resident Engineer; ??; J.T. Madill, Alcan Power Engineer; Norm Bradshaw, Bank Accountant; Larry Ecroyd, Northern Sentinel.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo showing a group of those concerned with the Caissons Launching Operation including left to right, Messre, Jenkinson, Malby, McCallum, Whiting, J.B. Whitton, Wynne-Jones, Van Houten and Richard Hermann.
Photo showing a group of those concerned with the Caissons Launching Operation including left to right, Messre, Jenkinson, Malby, McCallum, Whiting, J.B. Whitton, Wynne-Jones, Van Houten and Richard Hermann.