Skip header and navigation

Revise Search

3 records – page 1 of 1.

Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
GMD
graphic material
Date Range
14 June 1962
Accession Number
2005.8.625
Scope and Content
Photo showing Second Mudslide on Highway 25 - 7 June 1962. a) Roadway (right of photo) .See our Chronological files - main floor. Major park development at Lakelse, commenced in 1959, was largely destroyed June 7, 1962, when a second mudslide swept away part of Highway 25 under construction and pushed timber and debris through the main campsite area of the part out into Lakelse Lake.
Part Of
Northern Sentinel Press Ltd Collection
Creator
Photographer: Max Patzelt
Description Level
Item
Accession Number
2005.8.625
GMD
graphic material
Responsibility
Max Patzelt
Date Range
14 June 1962
Physical Description
1 photograph: b&w; 6" x 6"
Custodial History
Current: 1960s: Mudslide
Scope and Content
Photo showing Second Mudslide on Highway 25 - 7 June 1962. a) Roadway (right of photo) .See our Chronological files - main floor. Major park development at Lakelse, commenced in 1959, was largely destroyed June 7, 1962, when a second mudslide swept away part of Highway 25 under construction and pushed timber and debris through the main campsite area of the part out into Lakelse Lake.
Name Access
Lakelse Lake
Subject Access
Mudslide - 7 June 1962
Storage Location
Artifact Storage
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
GMD
graphic material
Date Range
14 June 1962
Accession Number
2005.8.626
Scope and Content
Photo showing Second Mudslide on Highway 25. 7 June 1962. a) at bottom of hill (Waterlily Bay) looking through to Lakelse Lake. The slide was the second to hit the highway construction within two weeks. Construction equipment was lost and a trailer camped at Lakelse was demolished by falling timber.
Part Of
Northern Sentinel Press Ltd Collection
Creator
Photographer: Max Patzelt
Description Level
Item
Accession Number
2005.8.626
GMD
graphic material
Responsibility
Max Patzelt
Date Range
14 June 1962
Physical Description
1 photograph: b&w; 7.5" x 5.5"
Custodial History
Current: 1960s: Mudslide
Scope and Content
Photo showing Second Mudslide on Highway 25. 7 June 1962. a) at bottom of hill (Waterlily Bay) looking through to Lakelse Lake. The slide was the second to hit the highway construction within two weeks. Construction equipment was lost and a trailer camped at Lakelse was demolished by falling timber.
Name Access
Lakelse Lake
Subject Access
Mudslide - 7 June 1962
Storage Location
Artifact Storage
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
GMD
graphic material
Date Range
14 June 1962
Accession Number
2005.8.628
Scope and Content
Photo showing second Mudslide on Highway 25 - 7 June 1962. 1) Photo shows point of impact, where highway gave away. Department of Highways crews under the supervision of district highway superintendent Carl Shaw of Terrace, worked around the clock to punch a detour through rock to restore road connection between the two towns in record time. Highway construction was suspended pending results of soil tests in the area to determine the cause of the slide.
Part Of
Northern Sentinel Press Ltd Collection
Creator
Photographer: Max Patzelt
Description Level
Item
Accession Number
2005.8.628
GMD
graphic material
Responsibility
Max Patzelt
Date Range
14 June 1962
Physical Description
1 photograph: b&w; 7.5" x 5.5"
Custodial History
Current: 1960s: Mudslide
Scope and Content
Photo showing second Mudslide on Highway 25 - 7 June 1962. 1) Photo shows point of impact, where highway gave away. Department of Highways crews under the supervision of district highway superintendent Carl Shaw of Terrace, worked around the clock to punch a detour through rock to restore road connection between the two towns in record time. Highway construction was suspended pending results of soil tests in the area to determine the cause of the slide.
Name Access
Lakelse Lake
Subject Access
Mudslide - 7 June 1962
Storage Location
Artifact Storage