Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
Photograph of 4-pole structure that will temporarily serve the electrical districtbution for the City Centre. Note the external steps on the South Side of the Alcan commecial building.
Photograph of 4-pole structure that will temporarily serve the electrical districtbution for the City Centre. Note the external steps on the South Side of the Alcan commecial building.
Photograph showing Haisla Bridge construction. Temp bridge with a vehicle on it is visible on the left. People working and machinery can be seen up on the bridge on the right.
Photograph showing Haisla Bridge construction. Temp bridge with a vehicle on it is visible on the left. People working and machinery can be seen up on the bridge on the right.
Notes
Photo is in two parts and taped together in the middle.