Photo depicts an aerial view of a portion of the Nechako neighbourhood showing the Hullah prototype area, Pintail and Partridge streets, in the foreground.
Photo depicts an aerial view of a portion of the Nechako neighbourhood showing the Hullah prototype area, Pintail and Partridge streets, in the foreground.
Notes
Title based on content of photograph. District of Kitimat Collection
Photo depicts an aerial view of the powerhouse switchyard and entrance up to the 1600' level. The wide clearing on the right is the tram right-of-way. The powerhouse tailrace tunnel and channel and the access tunnel portal are in the centre, and the construction camp is on the left. Alcan Collection
Photo depicts an aerial view of the powerhouse switchyard and entrance up to the 1600' level. The wide clearing on the right is the tram right-of-way. The powerhouse tailrace tunnel and channel and the access tunnel portal are in the centre, and the construction camp is on the left. Alcan Collection
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Notes
Title based on content of photograph. -- Alcan ID Numbers BC-2-243 and ACM-24311. Alcan Collection 78.11.32
Photo depicts an aerial view looking northwest of Smeltersite housing, the hospital on the beach, the school in the centre, and the seaplane landing ramp.
Photo depicts an aerial view looking northwest of Smeltersite housing, the hospital on the beach, the school in the centre, and the seaplane landing ramp.
Notes
Title based on content of photograph. -- Alcan ID No. J-43-1837. Kitimat Heritage Advisory Commission Collection. KMA No. P00209.jpg
Photo depicts a view of Minette Bay scow grid with two barges being unloaded. The left barge is loaded with Johnson Crooks materials and the right barge with Hullah Construction materials.
Photo depicts a view of Minette Bay scow grid with two barges being unloaded. The left barge is loaded with Johnson Crooks materials and the right barge with Hullah Construction materials.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-1061. Alcan Collection 78.11.89
Photo depicts Electrician Bill Frahler's family standing beside his truck. Johnson-Crooks houses under construction in Nechako Neighbourhood are in the background.
Photo depicts Electrician Bill Frahler's family standing beside his truck. Johnson-Crooks houses under construction in Nechako Neighbourhood are in the background.
Notes
Title based on content of photograph. -- "Alva and the Boys", Slide No. 95 -- Bill Frahler wired over 2,000 temporary construction and permanent homes between 1954 and 1958, first working for Johnson-Crooks and then Straits Construction. Bill Frahler Collection 2003.32
Photo depicts the boardwalk between homes 36 and 32 on Finch Steet in the Nechako neighbourhood. View is north-east looking towards Nalabila Boulevard.
Photo depicts the boardwalk between homes 36 and 32 on Finch Steet in the Nechako neighbourhood. View is north-east looking towards Nalabila Boulevard.
Notes
Title based on content of photograph. -- This house type was called a "chicken coop". -- Photograph taken from Fulmar Street. Alcan Collection 73.3.6.1
Photo depicts the Last Spike Ceremony for the Canadian National Railway Terrace to Kitimat line. From left is Duncan K. Kerr, Vice President of Associated Boards of Trade of B.C.; S.F. Dingle, Vice President of C.N.R, seen here driving in the aluminum spike.; Major J.L. Charles, Chief Engineer, C.N.R. Western Region; and Percy E. Radley, Alcan Project Manager.
Photo depicts the Last Spike Ceremony for the Canadian National Railway Terrace to Kitimat line. From left is Duncan K. Kerr, Vice President of Associated Boards of Trade of B.C.; S.F. Dingle, Vice President of C.N.R, seen here driving in the aluminum spike.; Major J.L. Charles, Chief Engineer, C.N.R. Western Region; and Percy E. Radley, Alcan Project Manager.
Reeve Sam Lindsay beginning the ceremonial burning of the municipal debentures totaling $2 million for the Haisla Bridge. All had just been paid in full, November 14, 1964.
Reeve Sam Lindsay beginning the ceremonial burning of the municipal debentures totaling $2 million for the Haisla Bridge. All had just been paid in full, November 14, 1964.
View of the audience and a portion of the Vancouver Symphony as they performed in the Mount Elizabeth Secondary School gym. Shows audience on gym floor as well as those in the bleachers.
1 photograph : b&w ; 25.3 x 20.3 cm
1 negative : b&w ; 12.6 x 10 cm
Scope and Content
View of the audience and a portion of the Vancouver Symphony as they performed in the Mount Elizabeth Secondary School gym. Shows audience on gym floor as well as those in the bleachers.