Kitimat Museum and Archives
GMD
Organizational Objects
Object Type
Plaque
Material
Acrylic
Accession Number
2018.26.3
Description
Clear, rectangle plaque with image of the Alcan smelter embeded inside. Black top and bottom. Text on plaque reads "Thank you for your hard work and commitment", "Kitimat Modernization Project", "Building the Future Together", and "In recognition of Notice to Proceed December 1, 2011." There is also the Rio Tinto Alcan logo on the top left, and Bechtel logo on the top right.
Title
Kitimat Modernization Project
GMD
Organizational Objects
Object Type
Plaque
Description
Clear, rectangle plaque with image of the Alcan smelter embeded inside. Black top and bottom. Text on plaque reads "Thank you for your hard work and commitment", "Kitimat Modernization Project", "Building the Future Together", and "In recognition of Notice to Proceed December 1, 2011." There is also the Rio Tinto Alcan logo on the top left, and Bechtel logo on the top right.
Physical Condition
fair
Material
Acrylic
Condition Remarks
Noticeable scratches
Height
17.7cm
Width
2.5cm
Length
12.7cm
Accession Number
2018.26.3
Biographical Notes
Allen Veasey was the Services, Interface & Risk Manager for KMP
Category
Ceremonial Objects
Location
Bay 1 Shelf 3 Box 6