Kitimat Museum and Archives
Part Of
Public archives of Canada
Description Level
Item
GMD
graphic material
Date Range
1898 - 1900
Accession Number
75.69.4
Scope and Content
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning, current 10 miles per hour.
Part Of
Public archives of Canada
Description Level
Item
Accession Number
75.69.4
GMD
graphic material
Date Range
1898 - 1900
Physical Description
1 photograph : b&w ; 25.5 x 20 cm
Scope and Content
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning, current 10 miles per hour.
Subject Access
Structures
Pioneer
Bridge
Geographic Access
Suskwa River
Storage Location
photograph storage