Kitimat Museum and Archives

The $3,000,000 Kitimat hospital has sceduled workers to be called in mid December

https://collections.kitimatmuseum.ca/en/permalink/description5260
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
GMD
graphic material
Accession Number
2005.8.7906
Scope and Content
Photograph of the $3,000,000 Kitimat hospital is sceduled to be called in mis December. It was designed by the Vanouver architectural firm of Thompson, Berwick and Pratt. The reinforced concrete structure will be built in two stages. Initial stage will provide 113 beds with services designed for 219 beds. It is included within the five storey structure that will be the public health facilities. In the foreground, and at right angles to the main hospital building, is the surgical wing under which is the single storey administration building. To the right is theproposed medical arts building to accommodate physicians, surgens, dentists and pharmacists. Hospital consultants for the project are Agnew, Craig and Peckham of Toronto. Completion of the first stage is sceduled for thr fall of 1959.
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
Accession Number
2005.8.7906
GMD
graphic material
Physical Description
1 photograph: b&w; 25.5 x 12.5 cm
Scope and Content
Photograph of the $3,000,000 Kitimat hospital is sceduled to be called in mis December. It was designed by the Vanouver architectural firm of Thompson, Berwick and Pratt. The reinforced concrete structure will be built in two stages. Initial stage will provide 113 beds with services designed for 219 beds. It is included within the five storey structure that will be the public health facilities. In the foreground, and at right angles to the main hospital building, is the surgical wing under which is the single storey administration building. To the right is theproposed medical arts building to accommodate physicians, surgens, dentists and pharmacists. Hospital consultants for the project are Agnew, Craig and Peckham of Toronto. Completion of the first stage is sceduled for thr fall of 1959.