Photo depicts Bob Jamieson, Chief Cook for Crawley McCracken posing with a bear that is being hand fed by someone out of sight. The men's bunkhouse in Smeltersite is in the background.
Photo depicts Bob Jamieson, Chief Cook for Crawley McCracken posing with a bear that is being hand fed by someone out of sight. The men's bunkhouse in Smeltersite is in the background.
Notes
Title based on content of photograph. Alcan Collection 73.3.3.24
Photo depicts the upper Kemano Valley, Twin Peaks and the Pass as seen overlooking the muck dump area and shop on the 2600' level at the Kemano end of the main power tunnel No. 1 looking North.
Photo depicts the upper Kemano Valley, Twin Peaks and the Pass as seen overlooking the muck dump area and shop on the 2600' level at the Kemano end of the main power tunnel No. 1 looking North.
Notes
Alcan ID no. KR-861. -- Photo taken from the bunkhouse area. Alcan Collection
Photo depicts a black bear hanging onto the passenger side door of a survey truck.
Notes
Title based on content of photograph. Northern Sentinel Press Collection. Published Thursday, September 2, 1954. Caption: "SOME BEARS don't drive, we're told. This friendly fellow, so the story goes, offered to drive Alcan photographer Fred Ryan back to his dark room to see his picture processed. Shot was taken near newly erected Anderson Creek railway bridge, while Fred was taking progress pictures."
Photo depicts a barge loaded with muck dredged from the wharf area. The International TD-9 dozer boat on the barge was there to push loads off as the barge was moved along.
Photo depicts a barge loaded with muck dredged from the wharf area. The International TD-9 dozer boat on the barge was there to push loads off as the barge was moved along.
Notes
Title based on content of photograph. -- International Harvester Company ID No. C 6039. International Harvester Company manufacturerd construction equipment purchased for the Project. -- Dredging at the wharf area provided sufficient water space for large ships to dock. Muck was dumped onto these barges by the clamshell bucket and towed out to deep water. Hal Whiting Collection 985.65.123
Photo depicts the powerhouse's Unit No. 4 showing screeds set and resteel installed for concrete pour No. 1 to Elevation 184.0'. The tailrace channel is seen top right.
Photo depicts the powerhouse's Unit No. 4 showing screeds set and resteel installed for concrete pour No. 1 to Elevation 184.0'. The tailrace channel is seen top right.
Notes
Title based on content of photograph. -- Alcan ID No. 5793. Alcan Collection
Photo depicts three men standing beside the scroll case for Unit No. 4, which is awaiting transport into the powerhouse. View is from the portal entrance looking towards Mt. Powell.
Photo depicts three men standing beside the scroll case for Unit No. 4, which is awaiting transport into the powerhouse. View is from the portal entrance looking towards Mt. Powell.
Notes
Title based on content of photograph. -- Alcan ID No. 5793. Alcan Collection
Photo depicts a worker with a double-headed axe on the Alcan Project posed at a waterfall located in the Kemano area.
Notes
Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.76
Photo depicts a surveyor on the Alcan Project surveying and posed beside a waterfall located in the Kemano area.
Notes
Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. -- ID No. C6067. Hal Whiting Collection 985.65.79
Photo depicts a month's supply of powdered milk inside the dairy at Camp No. 5, Kemano. Two dairy workers are lifting a barrel to stack it onto another.
Photo depicts a month's supply of powdered milk inside the dairy at Camp No. 5, Kemano. Two dairy workers are lifting a barrel to stack it onto another.
Notes
Title based on content of photograph. -- Alcan ID No. KR-651.
Photo depicts a month's supply of powdered milk inside the dairy at Camp No. 5, Kemano. Two dairy workers are lifting a barrel to stack it onto another.
Photo depicts a month's supply of powdered milk inside the dairy at Camp No. 5, Kemano. Two dairy workers are lifting a barrel to stack it onto another.
Notes
Title based on content of photograph. -- Alcan ID No. KR-651.
Photo depicts the permanent Kemano townsite at Camp No. 5. View is looking towards beach. Seen on the left are permanent homes for powerhouse staff. On the right are the temporary buildings known as quonset huts used during the construction years as crew quarters.
Photo depicts the permanent Kemano townsite at Camp No. 5. View is looking towards beach. Seen on the left are permanent homes for powerhouse staff. On the right are the temporary buildings known as quonset huts used during the construction years as crew quarters.
Notes
Title based on content of photograph. -- Alcan ID No. 2KR-298. -- Permanent housing construction began in 1957. Alcan Collection
Illustration depicts the extent of the Project, from the Kenney Dam and reservoir area to the transmission line and smelter. The future tunnel or the Kemano Completion Project is also included.
Illustration depicts the extent of the Project, from the Kenney Dam and reservoir area to the transmission line and smelter. The future tunnel or the Kemano Completion Project is also included.
Notes
Illustration from Alcan's publication "Kitimat-Kemano, Five Years of Operation, 1954-1959". Alcan Collection
Photo depicts an International TD-24 crawler dozing tunnel muck at the 2600' camp above the Kemano Valley.
Notes
ID No. C 6098. -- Title based on content of photo. -- The International Harvester Company, manufacturers of construction equipment such as this crawler purchased for the Project. Hal Whiting Collection 985.65.75