Photo depicts the aggregate stockpile at Horetzky, being built up to a total of 120,000 cubic yards for the power tunnel lining. View is looking south from the top of the batch plant.
Photo depicts the aggregate stockpile at Horetzky, being built up to a total of 120,000 cubic yards for the power tunnel lining. View is looking south from the top of the batch plant.
Photo depicts a worker looking up at a sign above the entrance to the recreation hall that reads, "Tunnel target, give them both barrels Tahtsa." The sign was a target date for the two ends of the tunnel to meet September 1st.
Photo depicts a worker looking up at a sign above the entrance to the recreation hall that reads, "Tunnel target, give them both barrels Tahtsa." The sign was a target date for the two ends of the tunnel to meet September 1st.