Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Notes
Title based on content of photograph. -- Slide No. 40 -- The circus tent assembly line was erected at Vancouver Tug and Barge below the Lion's Gate Bridge. Temporary housing destined for Kitimat was assembled there in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Bill Frahler Collection 2003.32
Photo depicts the exterior of the newly completed Nechako Centre in Kitimat, Shop Easy at the end of the complex. A bulldozer compacts the gravel - site preparation for the parking lot.
Photo depicts the exterior of the newly completed Nechako Centre in Kitimat, Shop Easy at the end of the complex. A bulldozer compacts the gravel - site preparation for the parking lot.
Notes
Title based on content of photograph. Part of Board of School Trustees Collection 982.91
Photograph of Hullah Houses under construction, 8 houses can be seen spread across the site with various construction and wood supplies scattered in the forground.
Photograph of Hullah Houses under construction, 8 houses can be seen spread across the site with various construction and wood supplies scattered in the forground.
Edwin Charles Bateman (Ted) was a Commando in WWII, and later enjoyed his hobbies of cycle racing, ballroom dancing, and photography. He lived in Toronto, LA, and finally Vancouver in the early 50s. After arriving in vancouver he was offered a job as an assistant surveyor in Kitimat. He was subsequently offered a job as a lineman with what became BC Tel.
Custodial History
Judith Saunders
Scope and Content
Photograph of cleared space with newly built Kitimat houses.