Photo depicts the upper Kemano Valley, Twin Peaks and the Pass as seen overlooking the muck dump area and shop on the 2600' level at the Kemano end of the main power tunnel No. 1 looking North.
Photo depicts the upper Kemano Valley, Twin Peaks and the Pass as seen overlooking the muck dump area and shop on the 2600' level at the Kemano end of the main power tunnel No. 1 looking North.
Notes
Alcan ID no. KR-861. -- Photo taken from the bunkhouse area. Alcan Collection
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.
Photo depicts the welcome sign for Kitimat on the wharf that greeted all workers to the Kitimat Project upon their arrival by boat.
Notes
Title based on content of photograph. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.113
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Notes
Title based on content of photograph. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.99
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Notes
Title based on content of photograph. -- Alcan ID Numbers BC-2-243 and ACM-24311. Alcan Collection 78.11.32
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Notes
Title based on content of photograph. Alcan Collection 79.31.7
Photo depicts seven International L-190 trucks, complete with Jaeger ready-mix concrete machines. These trucks were the first installment of a large fleet at Kitimat.
Photo depicts seven International L-190 trucks, complete with Jaeger ready-mix concrete machines. These trucks were the first installment of a large fleet at Kitimat.
Notes
Title based on content of photograph. -- International Harvester Company No. C 6101. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. -- In early July these trucks were waiting for the completion of the batching plant installation. The trucks carried concrete directly to the new smelter in the townsite and assisted in all other town and smelter construction. -- The batch plant was located at "Gravel Mountain" - the sandhill. Hal Whiting Collection 985.65.107