Photo depicts Morrison-Knudsen Company superintendents in front of the office building at Camp No. 5, Kemano. Second from left, Thomas R. Hooper, Carpenter Superintendent.
Photo depicts Morrison-Knudsen Company superintendents in front of the office building at Camp No. 5, Kemano. Second from left, Thomas R. Hooper, Carpenter Superintendent.
Notes
Alcan ID No. 5793. -- Title based on contents of photograph. Alcan Collection
Photo depicts Glen Bates, Mechanical Installation Superintendent, Morrison-Knudsen Company, as he checks a gauge registering 1,850 pounds per square inch during pressure testing of Unit No. 6 scrollcase. Mr. Bates is wearing a hardhat with the M.K. logo on it. Alcan Collection
Photo depicts Glen Bates, Mechanical Installation Superintendent, Morrison-Knudsen Company, as he checks a gauge registering 1,850 pounds per square inch during pressure testing of Unit No. 6 scrollcase. Mr. Bates is wearing a hardhat with the M.K. logo on it. Alcan Collection
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Illustration depicts a map of the Alcan project area, reaching from Prince Rupert to Kenney Dam. Seen is the transmission line, Kemano power plant and the lakes of the region.
Illustration depicts a map of the Alcan project area, reaching from Prince Rupert to Kenney Dam. Seen is the transmission line, Kemano power plant and the lakes of the region.
Notes
Clipping origin unknown. Fritz Wurster Collection. 2002.32
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Notes
Alcan ID no. KR-1499. -- M.K. refers to Morrison-Knudsen Company, contractor for the Project. Alcan Collection
Photo depicts the men in charge of operations. From left is Vice President A.W. Whitaker Jr. seen sitting in a helicopter; Project Manager Percy E. Radley; Chief Resident Engineer John Kendrick. The three men are all taking a look at what could be a map.
Photo depicts the men in charge of operations. From left is Vice President A.W. Whitaker Jr. seen sitting in a helicopter; Project Manager Percy E. Radley; Chief Resident Engineer John Kendrick. The three men are all taking a look at what could be a map.
Photo depicts the permanent Kemano townsite at Camp No. 5. View is looking towards beach. Seen on the left are permanent homes for powerhouse staff. On the right are the temporary buildings known as quonset huts used during the construction years as crew quarters.
Photo depicts the permanent Kemano townsite at Camp No. 5. View is looking towards beach. Seen on the left are permanent homes for powerhouse staff. On the right are the temporary buildings known as quonset huts used during the construction years as crew quarters.
Notes
Title based on content of photograph. -- Alcan ID No. 2KR-298. -- Permanent housing construction began in 1957. Alcan Collection
Photo depicts two men kneeling beside the first bags of mail to arrive via Pacific Western Airlines. On the right, Captain T. M. Kellough for PWA delivers the bags to on the left, Kitimat Express driver Lloyd Kaberg, at the wharf, Smeltersite. Northern Sentinel Press Collection
Photo depicts two men kneeling beside the first bags of mail to arrive via Pacific Western Airlines. On the right, Captain T. M. Kellough for PWA delivers the bags to on the left, Kitimat Express driver Lloyd Kaberg, at the wharf, Smeltersite. Northern Sentinel Press Collection