The framework of the building with a crane lowering the last ceiling glue-lam beam into position while workers look on.
Notes
Title based on content of photograph. -- The Y.M.C.A. opened its doors in 1957. This lounge structure under construction is now the Community Room for the District of Kitimat Recreation Riverlodge facility. Alcan Collection 73.3.7.6
Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Notes
Title based on content of photograph. -- Slide No. 40 -- The circus tent assembly line was erected at Vancouver Tug and Barge below the Lion's Gate Bridge. Temporary housing destined for Kitimat was assembled there in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Bill Frahler Collection 2003.32
Photo depicts the exterior of the newly completed Nechako Centre in Kitimat, Shop Easy at the end of the complex. A bulldozer compacts the gravel - site preparation for the parking lot.
Photo depicts the exterior of the newly completed Nechako Centre in Kitimat, Shop Easy at the end of the complex. A bulldozer compacts the gravel - site preparation for the parking lot.
Notes
Title based on content of photograph. Part of Board of School Trustees Collection 982.91
Photo depicts two barges moored in Douglas Channel and loaded with flat-top house sections for construction workers and their families.
Notes
Title based on content of photograph. -- Temporary housing destined for Kitimat was assembled at Vancouver Tug and Barge below the Lion's Gate Bridge in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Pat Jimenez Collection
Photo depicts flat-top temporary housing lining the hillside up to the Aluminum City Motel at the treeline. View is northwest. Grader on Kuldo Boulevard.
Photo depicts flat-top temporary housing lining the hillside up to the Aluminum City Motel at the treeline. View is northwest. Grader on Kuldo Boulevard.
Notes
Title based on content of photograph. -- Alcan Negative No. 29337. -- The circus tent assembly line was erected . Temporary housing destined for Kitimat was assembled at Vancouver Tug and Barge below the Lion's Gate Bridge in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. 73.3.6.6
Photo depicts students sitting at their desks in class at West Tahtsa Lake School. Smaller students join the teacher at the chalkboard. A cat beside them is peering out the window.
Photo depicts students sitting at their desks in class at West Tahtsa Lake School. Smaller students join the teacher at the chalkboard. A cat beside them is peering out the window.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection