Skip header and navigation

Revise Search

2 records – page 1 of 1.

Beam and column construction in the powerhouse

https://collections.kitimatmuseum.ca/en/permalink/description82
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
August 23, 1953
Scope and Content
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
76
GMD
graphic material
Responsibility
Power Operations, Alcan Primary Metal B.C.
Date Range
August 23, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Notes
Title based on content of photograph. -- Alcan ID No. KR-1160. Alcan Collection
Subject Access
Powerhouses
Images

Horetzky Camp quonset hut construction

https://collections.kitimatmuseum.ca/en/permalink/description38
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
September 21, 1951
Scope and Content
Photo depicts Horetzky Camp's many aluminum-sided quounset huts during construction. The camp is situated at the foot of Mt. Horetzky.
Part Of
Kitimat Museum Website Collection
Creator
Morrison-Knudsen Company
Description Level
Item
Item Number
32
GMD
graphic material
Date Range
September 21, 1951
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts Horetzky Camp's many aluminum-sided quounset huts during construction. The camp is situated at the foot of Mt. Horetzky.
Notes
Alcan Collection
Subject Access
Tunnels
Camps
Images