Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-320. Hal Whiting Collection 985.65.211
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection
The framework of the building with a crane lowering the last ceiling glue-lam beam into position while workers look on.
Notes
Title based on content of photograph. -- The Y.M.C.A. opened its doors in 1957. This lounge structure under construction is now the Community Room for the District of Kitimat Recreation Riverlodge facility. Alcan Collection 73.3.7.6
Title based on content of photograph. -- Haisla Bridge, Kitimat's first permanent bridge was completed by the end of 1953 and officially opened in 1957. -- The cost was over one million dollars. District of Kitimat Collection. District of Kitimat Collection 987.10.2
Photo depicts Philip ("Flying Phil") Gaglardi, B.C. Minister of Highways at the Hirsch Creek section, during construction of Highway No. 25, Terrace to Kitimat. View is looking towards Terrace.
Photo depicts Philip ("Flying Phil") Gaglardi, B.C. Minister of Highways at the Hirsch Creek section, during construction of Highway No. 25, Terrace to Kitimat. View is looking towards Terrace.
Notes
Title based on content of photograph. Photograph appeared in the Northern Sentinel, August 24, 1956. Northern Sentinel Press Collection No. 2005.8.695.
Construction happening at city centre with a huge hole beside the Bank of Commerce. There is also a lot of construction equipment. The area in front of City Centre mall is boarded off and out of limits. City Centre Mall expansion construction.
1 photograph : b&w ; 10.4 x 12.6 cm
1 negative : b&w ; 9.9 x 12.5 cm
Scope and Content
Construction happening at city centre with a huge hole beside the Bank of Commerce. There is also a lot of construction equipment. The area in front of City Centre mall is boarded off and out of limits. City Centre Mall expansion construction.
Photo showing the "Big Boss" of B.C Highways Hon. Phil Gaglardi (foreground at right) surveying the construction work being done on the highway. Bulldozer in middleground and tractor in background.
-Construction of Hwy 25
-Opened 28 November 1957
Photo showing the "Big Boss" of B.C Highways Hon. Phil Gaglardi (foreground at right) surveying the construction work being done on the highway. Bulldozer in middleground and tractor in background.
-Construction of Hwy 25
-Opened 28 November 1957
Photo depicts the unlined rock tunnel of horizontal penstock No. 2 at Elevation 210'. View is looking at platform at base of 48 degree inclined raise to 1685' Elevation.
Photo depicts the unlined rock tunnel of horizontal penstock No. 2 at Elevation 210'. View is looking at platform at base of 48 degree inclined raise to 1685' Elevation.
Notes
Alcan ID no. 2KR-10. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection
Photo depicts a worker watching as a 19-ton horizontal penstock liner is transported on an aerial tramway from Camp No. 5 to Camp No. 1600.
Notes
Alcan ID no. 2KR-81. -- This liner was the first and largest of the penstock liners. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-846. -- Note progress of conveyor gallery steel, kangaroo crane and pneumatic unloading equipment. Alcan Collection 78.11.68
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Notes
Title based on content of photograph. -- Alcan ID No. KR-1160. Alcan Collection