From the years 1953-1958, Mike Kinnear took photos during his school years, until graduation, while working for Fred Ryan Ltd. after school and holidays. Photos for him was a hobby, and he took many photos of the smelter and townsite as it grew around him. Mike also took a number of photos for the Kitimat Northern Sentinel, during the Ken Brumley and Pixie Meldrum years as editors. Mike and his family left Kitimat in 1958, but he spent the best part of 40 years in the photographic field, mainly in the retail/wholesale part of the photo industry.
Custodial History
Donated by Margaret and Mike Kinnear.
Scope and Content
Photograph of interior view of power station at Alcan showing the transformers.
Photograph of Aerial View of Alcan Smelter ; (Lines 1 and 2) Yacht Club ; Smeltersite ; Business ; Industrial ; Aluminum Co. of Canada ; Recreation and Sports ; Yacht Club Basin
Photograph of Aerial View of Alcan Smelter ; (Lines 1 and 2) Yacht Club ; Smeltersite ; Business ; Industrial ; Aluminum Co. of Canada ; Recreation and Sports ; Yacht Club Basin
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Notes
Alcan ID no. KR-1499. -- M.K. refers to Morrison-Knudsen Company, contractor for the Project. Alcan Collection
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.
Photo showing view looking west, centre foreground: forms in place for sheet piling for east piers, right foreground: first and second cribs of east and temporary bridge, centre background: right sheet piling center piers all placed, left-western cribs and deck for temporary bridge being placed.
Photo showing view looking west, centre foreground: forms in place for sheet piling for east piers, right foreground: first and second cribs of east and temporary bridge, centre background: right sheet piling center piers all placed, left-western cribs and deck for temporary bridge being placed.