2 records – page 1 of 1.

Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
December 02, 1953
Scope and Content
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
56
GMD
graphic material
Responsibility
Power Operations, Alcan Primary Metal B.C.
Date Range
December 02, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Notes
Alcan ID no. KR-1499. -- M.K. refers to Morrison-Knudsen Company, contractor for the Project. Alcan Collection
Name Access
Davis, Whitey
DuBose, McNeely
Madsen, Mr.
Matthias, Franklin
Radley, Percy E.
Reed, Mr.
Rland, V.
Roestad, Mr.
Subject Access
Tunnels
Images

Tent with flat-top house assembly

https://collections.kitimatmuseum.ca/en/permalink/description222
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
ca. 1956
Scope and Content
Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Part Of
Kitimat Museum Website Collection
Creator
Bill Frahler
Description Level
Item
Item Number
216
GMD
graphic material
Date Range
ca. 1956
Physical Description
1 slide : col.
Scope and Content
Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Notes
Title based on content of photograph. -- Slide No. 40 -- The circus tent assembly line was erected at Vancouver Tug and Barge below the Lion's Gate Bridge. Temporary housing destined for Kitimat was assembled there in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Bill Frahler Collection 2003.32
Subject Access
Construction of Buildings