Scope and Content
Photo depicts the aggregate stockpile at Horetzky, being built up to a total of 120,000 cubic yards for the power tunnel lining. View is looking south from the top of the batch plant.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
54
GMD
graphic material
Responsibility
Power Operations, Alcan Primary Metal B.C.
Date Range
October 29, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts the aggregate stockpile at Horetzky, being built up to a total of 120,000 cubic yards for the power tunnel lining. View is looking south from the top of the batch plant.
Notes
Alcan ID no. KR-1403. Alcan Collection
Subject Access
Tunnels
Images

Prepakt aggregate conveyor

https://collections.kitimatmuseum.ca/en/permalink/description67
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
October 29, 1955
Scope and Content
Photo depicts the Prepakt aggregate conveyor in foreground during operations at elbow (seen in distance), Elevation 210'. View is looking upstream along No. 2 penstock.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
61
GMD
graphic material
Responsibility
Power Operations, Alcan Primary Metal B.C.
Date Range
October 29, 1955
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts the Prepakt aggregate conveyor in foreground during operations at elbow (seen in distance), Elevation 210'. View is looking upstream along No. 2 penstock.
Notes
Alcan ID no. 5793. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection
Subject Access
Tunnels
Images

Aggregate and batch plant

https://collections.kitimatmuseum.ca/en/permalink/description128
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
October 04, 1952
Scope and Content
Photo depicts the aggregate and batch plant, which supplied the concrete for the large combined footings.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
122
GMD
graphic material
Responsibility
Power Operations, Alcan Primary Metal B.C.
Date Range
October 04, 1952
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts the aggregate and batch plant, which supplied the concrete for the large combined footings.
Notes
Title based on content of photograph. -- Alcan ID No. KR-565. Alcan Collection
Subject Access
Transmission line
Images
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
1956
Scope and Content
Photo depicts a newly erected conveyor to be used in transporting fill to the smelter.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
139
GMD
graphic material
Date Range
1956
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts a newly erected conveyor to be used in transporting fill to the smelter.
Notes
Title based on content of photograph. This photograph number is 2005.8.215
Subject Access
Smelters
Images

Caisson launching operation group

https://collections.kitimatmuseum.ca/en/permalink/description148
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
May 15, 1953
Scope and Content
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
142
GMD
graphic material
Date Range
May 15, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Name Access
Hermann, Dick
Jenkinson, Cam
Malby, George
McCallum, Mr.
Van Houten, Mr.
Whiting, Hal
Whitton, J. B.
Wynne-Jones, Mr.
Subject Access
Smeltersite
Alcan Smelters & Chemicals Ltd.
Images

Aerial view of smelter operation

https://collections.kitimatmuseum.ca/en/permalink/description152
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
ca. 1965
Scope and Content
Photo depicts an aerial view of smelter operation in Kitimat.
Part Of
Kitimat Museum Website Collection
Creator
Alcan
Description Level
Item
Item Number
146
GMD
graphic material
Date Range
ca. 1965
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts an aerial view of smelter operation in Kitimat.
Notes
Title based on content of photograph. -- Alcan Public Relations Department ID No. ICT 177-30 Fred Busby Collection 2002.27
Subject Access
Smelters
Images
Material Type
Virtual Exhibit
Description
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.
  1 image     1 website  
Material Type
Virtual Exhibit
Description
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.
Images
Websites / Virtual Exhibits

7 records – page 1 of 1.