Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Notes
Alcan ID no. KR-1499. -- M.K. refers to Morrison-Knudsen Company, contractor for the Project. Alcan Collection
Photo showing contruction of Kildala wading pool, constructiong concrete forms. In Background: Mrs. Bill Norman, Mrs. Walter Zet, Mrs. Minori Nishi, Mrs. W.B Patton. In Foreground: Archie Beyerstein, Bill Patton, Jim Ditomassi, Norm Handford, Minori Nishi, Walter Zet, Frank Gulpers.
Northern Sentinel Box #3-(A) Historical (I) Service club (a) Lions Club
Scope and Content
Photo showing contruction of Kildala wading pool, constructiong concrete forms. In Background: Mrs. Bill Norman, Mrs. Walter Zet, Mrs. Minori Nishi, Mrs. W.B Patton. In Foreground: Archie Beyerstein, Bill Patton, Jim Ditomassi, Norm Handford, Minori Nishi, Walter Zet, Frank Gulpers.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Notes
Title based on content of photograph. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.99