Photo depicts the Prepakt aggregate conveyor in foreground during operations at elbow (seen in distance), Elevation 210'. View is looking upstream along No. 2 penstock.
Photo depicts the Prepakt aggregate conveyor in foreground during operations at elbow (seen in distance), Elevation 210'. View is looking upstream along No. 2 penstock.
Notes
Alcan ID no. 5793. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection
Photograph of the Sandhill aggregate operation. Sandhill in background, conveyor system from a shed in the base of the sandhill to a crusher. Operated by Kitimat Concrete Products Ltd.
Photograph of the Sandhill aggregate operation. Sandhill in background, conveyor system from a shed in the base of the sandhill to a crusher. Operated by Kitimat Concrete Products Ltd.
Photograph of the Sandhill aggregate operation. A one-story building with a steep roof, to right of sandhill. Piles of aggregate in fron of building. Glimpses of conveyor system inside building. Operated by Kitimat Concrete Products Ltd.
Photograph of the Sandhill aggregate operation. A one-story building with a steep roof, to right of sandhill. Piles of aggregate in fron of building. Glimpses of conveyor system inside building. Operated by Kitimat Concrete Products Ltd.
Photograph of the Sandhill aggregate operation. Sandhill in background, conveyor system from a shed in the base of the sandhill to a crusher. Operated by Kitimat Concrete Products Ltd.
Photograph of the Sandhill aggregate operation. Sandhill in background, conveyor system from a shed in the base of the sandhill to a crusher. Operated by Kitimat Concrete Products Ltd.