Photo depicts workers clearing the transmission line right-of-way. The smelter site preparation and smoke from the townsite clearing are in the distance.
Photo depicts workers clearing the transmission line right-of-way. The smelter site preparation and smoke from the townsite clearing are in the distance.
Notes
Title based on content of photograph. Alcan Collection Accession no. 73.3.10.1
Photo depicts the unlined rock tunnel of horizontal penstock No. 2 at Elevation 210'. View is looking at platform at base of 48 degree inclined raise to 1685' Elevation.
Photo depicts the unlined rock tunnel of horizontal penstock No. 2 at Elevation 210'. View is looking at platform at base of 48 degree inclined raise to 1685' Elevation.
Notes
Alcan ID no. 2KR-10. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection
Photo depicts a worker watching as a 19-ton horizontal penstock liner is transported on an aerial tramway from Camp No. 5 to Camp No. 1600.
Notes
Alcan ID no. 2KR-81. -- This liner was the first and largest of the penstock liners. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection