Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Notes
Alcan ID no. KR-1499. -- M.K. refers to Morrison-Knudsen Company, contractor for the Project. Alcan Collection
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Notes
Title based on contents of text. Ernie Archer Collection
Illustration depicts the extent of the Project, from the Kenney Dam and reservoir area to the transmission line and smelter. The future tunnel or the Kemano Completion Project is also included.
Illustration depicts the extent of the Project, from the Kenney Dam and reservoir area to the transmission line and smelter. The future tunnel or the Kemano Completion Project is also included.
Notes
Illustration from Alcan's publication "Kitimat-Kemano, Five Years of Operation, 1954-1959". Alcan Collection
Photo depicts a International diesel TD-24 spreading a layer of large stones at the base of the Nechako Dam.
Notes
ID no. C 5927. -- Title based on content of photo. -- These layers of various size rock stone and clay will all slope towards the rock fill at about a 45 degree pitch. Official naming ceremony renamed dam the Kenney Dam. Hal Whiting Collection 985.65.56
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection
Illustration depicts a map of the Alcan project area, reaching from Prince Rupert to Kenney Dam. Seen is the transmission line, Kemano power plant and the lakes of the region.
Illustration depicts a map of the Alcan project area, reaching from Prince Rupert to Kenney Dam. Seen is the transmission line, Kemano power plant and the lakes of the region.
Notes
Clipping origin unknown. Fritz Wurster Collection. 2002.32
Photo depicts the world record setting swing shift miners at the Horetzky-Kemano heading, posing on the Copco drill set-up with a sign that gives specifics to their record.
Photo depicts the world record setting swing shift miners at the Horetzky-Kemano heading, posing on the Copco drill set-up with a sign that gives specifics to their record.
Notes
Alcan ID no. KR-771. -- The project introduced a new breed of miner, the construction miner. Alcan Collection