Photo depicts high water conditions of Kitimat River at the south end of Service Centre. Near the water's edge in the background is a truck that has overturned.
Photo depicts high water conditions of Kitimat River at the south end of Service Centre. Near the water's edge in the background is a truck that has overturned.
Notes
Title based on content of photograph. -- Alcan ID No. J-2-183. -- Alcan Public Relations Department ID No. ICT 349-1. Photograph taken at 2:30 p.m. Truck overturned when the road gave way. River elevation was 50.45 feet and rose to a maximum of 51.1 feet at 6:30 p.m. Alcan Collection 73.3.6.13
Photo depicts the unlined rock tunnel of horizontal penstock No. 2 at Elevation 210'. View is looking at platform at base of 48 degree inclined raise to 1685' Elevation.
Photo depicts the unlined rock tunnel of horizontal penstock No. 2 at Elevation 210'. View is looking at platform at base of 48 degree inclined raise to 1685' Elevation.
Notes
Alcan ID no. 2KR-10. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection
Photo depicts a worker watching as a 19-ton horizontal penstock liner is transported on an aerial tramway from Camp No. 5 to Camp No. 1600.
Notes
Alcan ID no. 2KR-81. -- This liner was the first and largest of the penstock liners. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection