Photo depicts a barge loaded with muck dredged from the wharf area. The International TD-9 dozer boat on the barge was there to push loads off as the barge was moved along.
Photo depicts a barge loaded with muck dredged from the wharf area. The International TD-9 dozer boat on the barge was there to push loads off as the barge was moved along.
Notes
Title based on content of photograph. -- International Harvester Company ID No. C 6039. International Harvester Company manufacturerd construction equipment purchased for the Project. -- Dredging at the wharf area provided sufficient water space for large ships to dock. Muck was dumped onto these barges by the clamshell bucket and towed out to deep water. Hal Whiting Collection 985.65.123
Photo depicts a 5-ton steel ball measuring 8 feet in diameter, strung on a cable and pulled through the forest between two tractors. An unsuccessful experiment.
1 photograph : b&w
1 photograph : b&w ; 25 x 20 cm
Scope and Content
Photo depicts a 5-ton steel ball measuring 8 feet in diameter, strung on a cable and pulled through the forest between two tractors. An unsuccessful experiment.
Notes
Title based on content of photograph. -- Experimental area is being cleared with use of two TD-119 Allis-Chalmers tractors. Alcan Collection 73.3.3.23
Photo depicts the upper Kemano Valley, Twin Peaks and the Pass as seen overlooking the muck dump area and shop on the 2600' level at the Kemano end of the main power tunnel No. 1 looking North.
Photo depicts the upper Kemano Valley, Twin Peaks and the Pass as seen overlooking the muck dump area and shop on the 2600' level at the Kemano end of the main power tunnel No. 1 looking North.
Notes
Alcan ID no. KR-861. -- Photo taken from the bunkhouse area. Alcan Collection
Photo depicts the unlined rock tunnel of horizontal penstock No. 2 at Elevation 210'. View is looking at platform at base of 48 degree inclined raise to 1685' Elevation.
Photo depicts the unlined rock tunnel of horizontal penstock No. 2 at Elevation 210'. View is looking at platform at base of 48 degree inclined raise to 1685' Elevation.
Notes
Alcan ID no. 2KR-10. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection
Photo depicts a worker watching as a 19-ton horizontal penstock liner is transported on an aerial tramway from Camp No. 5 to Camp No. 1600.
Notes
Alcan ID no. 2KR-81. -- This liner was the first and largest of the penstock liners. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection