Photo depicts the aggregate stockpile at Horetzky, being built up to a total of 120,000 cubic yards for the power tunnel lining. View is looking south from the top of the batch plant.
Photo depicts the aggregate stockpile at Horetzky, being built up to a total of 120,000 cubic yards for the power tunnel lining. View is looking south from the top of the batch plant.
Kitimat Fire Department Equipment Equipment
1 - Gate Valve (may have been moved to off-site storage). The main body of the valve is painted red: 25.5cm L x
13.5cm W
2 - Battery-powered lantern with flick-switch on "head"
that is attached to chrome handle mounted on red box holding battery: 28cm x 15cm x 27cm
Kitimat Fire Department Equipment Equipment
1 - Gate Valve (may have been moved to off-site storage). The main body of the valve is painted red: 25.5cm L x
13.5cm W
2 - Battery-powered lantern with flick-switch on "head"
that is attached to chrome handle mounted on red box holding battery: 28cm x 15cm x 27cm
Five men in suits standing in front of mural. The two men on the ends have their hands by their side, and the three men in the middle have their hands behind their backs.
Five men in suits standing in front of mural. The two men on the ends have their hands by their side, and the three men in the middle have their hands behind their backs.
A photo of three men in suits. Two of the men are seated, and one man is standing in front of the microphone. There is a large map and two flags behind the three men.
A photo of three men in suits. Two of the men are seated, and one man is standing in front of the microphone. There is a large map and two flags behind the three men.