Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Notes
Title based on contents of text. Ernie Archer Collection
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.
Illustration depicts a map of the Alcan project area, reaching from Prince Rupert to Kenney Dam. Seen is the transmission line, Kemano power plant and the lakes of the region.
Illustration depicts a map of the Alcan project area, reaching from Prince Rupert to Kenney Dam. Seen is the transmission line, Kemano power plant and the lakes of the region.
Notes
Clipping origin unknown. Fritz Wurster Collection. 2002.32
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Notes
Alcan ID no. KR-1499. -- M.K. refers to Morrison-Knudsen Company, contractor for the Project. Alcan Collection
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection
Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Notes
Title based on content of photograph. -- Slide No. 40 -- The circus tent assembly line was erected at Vancouver Tug and Barge below the Lion's Gate Bridge. Temporary housing destined for Kitimat was assembled there in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Bill Frahler Collection 2003.32
The framework of the building with a crane lowering the last ceiling glue-lam beam into position while workers look on.
Notes
Title based on content of photograph. -- The Y.M.C.A. opened its doors in 1957. This lounge structure under construction is now the Community Room for the District of Kitimat Recreation Riverlodge facility. Alcan Collection 73.3.7.6
Photo depicts the exterior of the newly completed Nechako Centre in Kitimat, Shop Easy at the end of the complex. A bulldozer compacts the gravel - site preparation for the parking lot.
Photo depicts the exterior of the newly completed Nechako Centre in Kitimat, Shop Easy at the end of the complex. A bulldozer compacts the gravel - site preparation for the parking lot.
Notes
Title based on content of photograph. Part of Board of School Trustees Collection 982.91
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-320. Hal Whiting Collection 985.65.211