Skip header and navigation

Revise Search

3 records – page 1 of 1.

Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
November 22, 1952
Scope and Content
Forms for transition section at the intake. Most or all of these forms will be discarded due to recent revisions in the Intake Design.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
42
GMD
graphic material
Responsibility
Power Operations, Alcan Primary Metal B.C.
Date Range
November 22, 1952
Physical Description
1 photograph : b&w
Scope and Content
Forms for transition section at the intake. Most or all of these forms will be discarded due to recent revisions in the Intake Design.
Notes
Alcan ID no. KR-664. Alcan Collection
Subject Access
Tunnels
Images

Penstock No. 2 unlined rock tunnel

https://collections.kitimatmuseum.ca/en/permalink/description66
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
June 06, 1955
Scope and Content
Photo depicts the unlined rock tunnel of horizontal penstock No. 2 at Elevation 210'. View is looking at platform at base of 48 degree inclined raise to 1685' Elevation.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
60
GMD
graphic material
Responsibility
Power Operations, Alcan Primary Metal B.C.
Date Range
June 06, 1955
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts the unlined rock tunnel of horizontal penstock No. 2 at Elevation 210'. View is looking at platform at base of 48 degree inclined raise to 1685' Elevation.
Notes
Alcan ID no. 2KR-10. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection
Subject Access
Tunnels
Images

Kemano and Horetzky heading crews

https://collections.kitimatmuseum.ca/en/permalink/description61
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
October 23, 1953
Scope and Content
Photo depicts the Horetzky and Kemano heading crews meeting on top of the muck pile at the breakthrough point.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
55
GMD
graphic material
Responsibility
Power Operations, Alcan Primary Metal B.C.
Date Range
October 23, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts the Horetzky and Kemano heading crews meeting on top of the muck pile at the breakthrough point.
Notes
Alcan ID no. KR-1377. -- The crews bet on when they would meet the team working from the opposite end of the tunnel. Alcan Collection
Subject Access
Tunnels
Images