Generator parts for proposed powerhouse at Peace Canyon dam on Williston Reservoir, Hudson's Hope, BC. Off loading 1 set of turbine runner wheels at bay near Kenney Damn, bay was later named after the Apex Transporting Co. The wheels were made in Russia, transported to Seattle, barged up wash (could be Washington) to Kemano. All equip necessary for moving this was provided: trucks, barges, bulldozers, etc. and carried along. From Kemano to Horetsky Creek Road to Nechako reservoir then barged down reserve to dam area then trucked on logging roads to Vanderhoof. Then across country to Williston Reservoir. A huge undertaking with little publicity for some unknown reason. 1975-1980?
Parts of miner's lamps (carbide lamps) from Pacific (near Terrace). There is one fuel tank and two other parts that fuel tanks and reflectors are supposed to attach to.
Parts of miner's lamps (carbide lamps) from Pacific (near Terrace). There is one fuel tank and two other parts that fuel tanks and reflectors are supposed to attach to.
Assorted fire hose parts. One red angled "Y"-shaped piece (18 cm tall, 30 cm wide, 34 cm long), one red gate valve (25 cm tall, 13 cm wide, 10 cm long), two smaller diameter hose nozzels (6 cm diameter, 14 cm tall), and two larger diameter hose nozzels (7.5 cm diameter, 12 cm tall).
Assorted fire hose parts. One red angled "Y"-shaped piece (18 cm tall, 30 cm wide, 34 cm long), one red gate valve (25 cm tall, 13 cm wide, 10 cm long), two smaller diameter hose nozzels (6 cm diameter, 14 cm tall), and two larger diameter hose nozzels (7.5 cm diameter, 12 cm tall).
The envelope includes:
3 camera lens (Mamiya, 52mm, and Canon), a rubber piece, 2 metal tips with a plastic end (one looks like an aux cord), an eye cup, 2 electrical plugs, 2 electrical accessories, a metal dial, a glass dropper with red rubber holder, a cardboard cut out to help frame the picture when using a camera.
The use of most of the items in the bag are unidentified.
The envelope includes:
3 camera lens (Mamiya, 52mm, and Canon), a rubber piece, 2 metal tips with a plastic end (one looks like an aux cord), an eye cup, 2 electrical plugs, 2 electrical accessories, a metal dial, a glass dropper with red rubber holder, a cardboard cut out to help frame the picture when using a camera.
The use of most of the items in the bag are unidentified.
Photograph of an x-ray machine. In the photogrpah, there is special procedure equiptment containig closed circuit television with an image intensifier. There is a T.V camera at the top of the unit. Towards the left is the regular x-ray tube. Ray Mabbett is head x-ray tecnician.
Photograph of an x-ray machine. In the photogrpah, there is special procedure equiptment containig closed circuit television with an image intensifier. There is a T.V camera at the top of the unit. Towards the left is the regular x-ray tube. Ray Mabbett is head x-ray tecnician.
Notes
Pictures of where your various parts and pieces are and what shape and condition they are in is provided by the x-ray department. Central in the photograph is special procedure equipment containing closed circuit television with an image intensifier. The T. V camera is at the top of the unit. At the left is the regular x-ray tube. Ray Mabbett is the head x-ray technician.
Photo depicts two men looking up at the bottom bearing bracket for the powerhouse generator. The bracket, manufactured by Canadian General Electric Co., is on a low-boy outside the portal entrance.
Photo depicts two men looking up at the bottom bearing bracket for the powerhouse generator. The bracket, manufactured by Canadian General Electric Co., is on a low-boy outside the portal entrance.
Notes
Title based on content of photograph. -- Alcan ID No. 5793. Alcan Collection
Photograph of with the outer housing of the turbine in place, work proceeds with the installation of generator 8 in Alcan's Kemano Powerhouse, which will increase cpacity from the present 784,000 kilowatts to close to 98,000 kilowatts (1,200,000 H.P). The instillation of Generator 8 is being carried out by Mattias & Nicol, general contractors of Vancouver B.C. Employees of Canadian Westinghouse are now on site and are erecting the generator. Work began early in February with completion date for September.
Photograph of with the outer housing of the turbine in place, work proceeds with the installation of generator 8 in Alcan's Kemano Powerhouse, which will increase cpacity from the present 784,000 kilowatts to close to 98,000 kilowatts (1,200,000 H.P). The instillation of Generator 8 is being carried out by Mattias & Nicol, general contractors of Vancouver B.C. Employees of Canadian Westinghouse are now on site and are erecting the generator. Work began early in February with completion date for September.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.