Photo depicts the exterior of the newly completed Nechako Centre in Kitimat, Shop Easy at the end of the complex. A bulldozer compacts the gravel - site preparation for the parking lot.
Photo depicts the exterior of the newly completed Nechako Centre in Kitimat, Shop Easy at the end of the complex. A bulldozer compacts the gravel - site preparation for the parking lot.
Notes
Title based on content of photograph. Part of Board of School Trustees Collection 982.91
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-846. -- Note progress of conveyor gallery steel, kangaroo crane and pneumatic unloading equipment. Alcan Collection 78.11.68
Photo depicts a miner beside the penstock liner which is being lowered from the 2600' level.
Notes
Alcan ID no. KR-1386. -- Note the bridle assembly. -- Liners were lowered on a dolly on a 140-ton hoist, then transferred to skid rails for the final journey. Alcan Collection
Photo depicts the upper Kemano Valley, Twin Peaks and the Pass as seen overlooking the muck dump area and shop on the 2600' level at the Kemano end of the main power tunnel No. 1 looking North.
Photo depicts the upper Kemano Valley, Twin Peaks and the Pass as seen overlooking the muck dump area and shop on the 2600' level at the Kemano end of the main power tunnel No. 1 looking North.
Notes
Alcan ID no. KR-861. -- Photo taken from the bunkhouse area. Alcan Collection
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Notes
Title based on content of photograph. -- Alcan ID Numbers BC-2-243 and ACM-24311. Alcan Collection 78.11.32
Photo depicts a youth softball game in full swing at the Smeltersite softball diamond, bleacher crowd watches the action. Crew bunkhouses on the hill slope in the background.
Photo depicts a youth softball game in full swing at the Smeltersite softball diamond, bleacher crowd watches the action. Crew bunkhouses on the hill slope in the background.
Notes
Title based on content of photograph. Mike Kinnear Collection
Photo depicts an aerial view looking northwest of Smeltersite housing, the hospital on the beach, the school in the centre, and the seaplane landing ramp.
Photo depicts an aerial view looking northwest of Smeltersite housing, the hospital on the beach, the school in the centre, and the seaplane landing ramp.
Notes
Title based on content of photograph. -- Alcan ID No. J-43-1837. Kitimat Heritage Advisory Commission Collection. KMA No. P00209.jpg
Photo depicts a International diesel TD-24 spreading a layer of large stones at the base of the Nechako Dam.
Notes
ID no. C 5927. -- Title based on content of photo. -- These layers of various size rock stone and clay will all slope towards the rock fill at about a 45 degree pitch. Official naming ceremony renamed dam the Kenney Dam. Hal Whiting Collection 985.65.56
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection