Photo depicts workers excavating for the construction of the alumina storage building.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-451. -- Sloping sides avoided cave-ins. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.267
Photo depicts two members of the Kinsmen Club, from the left, Mike Skitcko and Dave Barclay, donating an anesthetic machine to the Kitimat General Hospital. Dr. Barbara Kraft is on the far right. Old accession #998.1.879.
Photo depicts two members of the Kinsmen Club, from the left, Mike Skitcko and Dave Barclay, donating an anesthetic machine to the Kitimat General Hospital. Dr. Barbara Kraft is on the far right. Old accession #998.1.879.
Two members of the Kinsmen Club, from the left, Mike Skitcko and Dave Barclay, donating an anesthetic machine to the Kitimat General Hospital. Dr. Barbara Kraft is on the far right.
Two members of the Kinsmen Club, from the left, Mike Skitcko and Dave Barclay, donating an anesthetic machine to the Kitimat General Hospital. Dr. Barbara Kraft is on the far right.
Photo depicts workers clearing the transmission line right-of-way. The smelter site preparation and smoke from the townsite clearing are in the distance.
Photo depicts workers clearing the transmission line right-of-way. The smelter site preparation and smoke from the townsite clearing are in the distance.
Notes
Title based on content of photograph. Alcan Collection Accession no. 73.3.10.1
Photo depicts a 5-ton steel ball measuring 8 feet in diameter, strung on a cable and pulled through the forest between two tractors. An unsuccessful experiment.
1 photograph : b&w
1 photograph : b&w ; 25 x 20 cm
Scope and Content
Photo depicts a 5-ton steel ball measuring 8 feet in diameter, strung on a cable and pulled through the forest between two tractors. An unsuccessful experiment.
Notes
Title based on content of photograph. -- Experimental area is being cleared with use of two TD-119 Allis-Chalmers tractors. Alcan Collection 73.3.3.23
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Notes
Title based on content of photograph. Alcan Collection 79.31.7
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-320. Hal Whiting Collection 985.65.211
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.