Skip header and navigation

Revise Search

2 records – page 1 of 1.

Horetzky Camp quonset hut construction

https://collections.kitimatmuseum.ca/en/permalink/description38
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
September 21, 1951
Scope and Content
Photo depicts Horetzky Camp's many aluminum-sided quounset huts during construction. The camp is situated at the foot of Mt. Horetzky.
Part Of
Kitimat Museum Website Collection
Creator
Morrison-Knudsen Company
Description Level
Item
Item Number
32
GMD
graphic material
Date Range
September 21, 1951
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts Horetzky Camp's many aluminum-sided quounset huts during construction. The camp is situated at the foot of Mt. Horetzky.
Notes
Alcan Collection
Subject Access
Tunnels
Camps
Images
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
December 02, 1953
Scope and Content
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
56
GMD
graphic material
Responsibility
Power Operations, Alcan Primary Metal B.C.
Date Range
December 02, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Notes
Alcan ID no. KR-1499. -- M.K. refers to Morrison-Knudsen Company, contractor for the Project. Alcan Collection
Name Access
Davis, Whitey
DuBose, McNeely
Madsen, Mr.
Matthias, Franklin
Radley, Percy E.
Reed, Mr.
Rland, V.
Roestad, Mr.
Subject Access
Tunnels
Images