Photo depicts the welcome sign for Kitimat on the wharf that greeted all workers to the Kitimat Project upon their arrival by boat.
Notes
Title based on content of photograph. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.113
Photo depicts a worker looking up at a sign above the entrance to the recreation hall that reads, "Tunnel target, give them both barrels Tahtsa." The sign was a target date for the two ends of the tunnel to meet September 1st.
Photo depicts a worker looking up at a sign above the entrance to the recreation hall that reads, "Tunnel target, give them both barrels Tahtsa." The sign was a target date for the two ends of the tunnel to meet September 1st.
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-320. Hal Whiting Collection 985.65.211
Photo depicts Morrison-Knudsen Company superintendents in front of the office building at Camp No. 5, Kemano. Second from left, Thomas R. Hooper, Carpenter Superintendent.
Photo depicts Morrison-Knudsen Company superintendents in front of the office building at Camp No. 5, Kemano. Second from left, Thomas R. Hooper, Carpenter Superintendent.
Notes
Alcan ID No. 5793. -- Title based on contents of photograph. Alcan Collection