Photo depicts a an International truck heading to Horetzky Creek Camp on the Horetzky Valley Road.
Notes
Morrison-Knudsen Company had several roads such as this one, constructed to get workers and equipment to the various work sites for tunnel construction. 985.65.80
Photo depicts an International truck heading to Horetzky Creek Camp on the Horetzky Valley Road.
Notes
Morrison-Knudsen Company had several roads such as this one, constructed to get workers and equipment to the various work sites for tunnel construction. 985.65.80
Diagram depicts penstock number 1 and 2 showing elevations.
Notes
Penstock No. 2 was completed after the smelter had started aluminum production with Penstock No. 1. -- Tunnel No. 2 with penstocks No. 3 & 4 was the Kemano Completion Project which was cancelled in 1991. Morrison-Knudsen Company Collection
Photo depicts men towing supplies over the snow on a [sled], that were brought in by a junker seen here to West Tahtsa Lake Camp. Other unidentified men are gathered around the airplane.
Photo depicts men towing supplies over the snow on a [sled], that were brought in by a junker seen here to West Tahtsa Lake Camp. Other unidentified men are gathered around the airplane.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection