Diagram depicts penstock number 1 and 2 showing elevations.
Notes
Penstock No. 2 was completed after the smelter had started aluminum production with Penstock No. 1. -- Tunnel No. 2 with penstocks No. 3 & 4 was the Kemano Completion Project which was cancelled in 1991. Morrison-Knudsen Company Collection
Photograph of stripping smeltersite. 2 1/2 yd. Northwest dragline and bottom-dump euclid. Powerhouse in left background. Fill testing laboratory in right background. Crane/shovel loading material in euclid.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of stripping smeltersite. 2 1/2 yd. Northwest dragline and bottom-dump euclid. Powerhouse in left background. Fill testing laboratory in right background. Crane/shovel loading material in euclid.
Photo depicts the Bailey Bridge across the inner end of the access tunnel with form work in the background. View is from a high elevation under the roof looking northwest.
Photo depicts the Bailey Bridge across the inner end of the access tunnel with form work in the background. View is from a high elevation under the roof looking northwest.
Notes
Title based on content of photograph. Alcan Collection
Photograph of transformers. powerhouse water intake. Three men at bottom, crane at right, water at middle and dirt at back walled off. Kemano Tunnel Collection.
Photograph of transformers. powerhouse water intake. Three men at bottom, crane at right, water at middle and dirt at back walled off. Kemano Tunnel Collection.