Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Notes
Title based on contents of text. Ernie Archer Collection
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts a man standing beside his truck, crossing the Kitimat River aboard a wood construction raft ferry, guard rail on two sides, and guided by a cabling system shown above the river.
Photo depicts a man standing beside his truck, crossing the Kitimat River aboard a wood construction raft ferry, guard rail on two sides, and guided by a cabling system shown above the river.
Notes
Title based on content of photograph. Alcan Collection 73.3.3.29
Photo depicts two men kneeling beside the first bags of mail to arrive via Pacific Western Airlines. On the right, Captain T. M. Kellough for PWA delivers the bags to on the left, Kitimat Express driver Lloyd Kaberg, at the wharf, Smeltersite. Northern Sentinel Press Collection
Photo depicts two men kneeling beside the first bags of mail to arrive via Pacific Western Airlines. On the right, Captain T. M. Kellough for PWA delivers the bags to on the left, Kitimat Express driver Lloyd Kaberg, at the wharf, Smeltersite. Northern Sentinel Press Collection
Photo depicts high water conditions of Kitimat River at the south end of Service Centre. Near the water's edge in the background is a truck that has overturned.
Photo depicts high water conditions of Kitimat River at the south end of Service Centre. Near the water's edge in the background is a truck that has overturned.
Notes
Title based on content of photograph. -- Alcan ID No. J-2-183. -- Alcan Public Relations Department ID No. ICT 349-1. Photograph taken at 2:30 p.m. Truck overturned when the road gave way. River elevation was 50.45 feet and rose to a maximum of 51.1 feet at 6:30 p.m. Alcan Collection 73.3.6.13
Photo depicts an International TD-24 crawler dozing tunnel muck at the 2600' camp above the Kemano Valley.
Notes
ID No. C 6098. -- Title based on content of photo. -- The International Harvester Company, manufacturers of construction equipment such as this crawler purchased for the Project. Hal Whiting Collection 985.65.75
Photo depicts a month's supply of powdered milk inside the dairy at Camp No. 5, Kemano. Two dairy workers are lifting a barrel to stack it onto another.
Photo depicts a month's supply of powdered milk inside the dairy at Camp No. 5, Kemano. Two dairy workers are lifting a barrel to stack it onto another.
Notes
Title based on content of photograph. -- Alcan ID No. KR-651.
Photo depicts a month's supply of powdered milk inside the dairy at Camp No. 5, Kemano. Two dairy workers are lifting a barrel to stack it onto another.
Photo depicts a month's supply of powdered milk inside the dairy at Camp No. 5, Kemano. Two dairy workers are lifting a barrel to stack it onto another.
Notes
Title based on content of photograph. -- Alcan ID No. KR-651.
Hotel Manager George More is seen with some of the boys around 6 a.m. in the Gordon's main beverage room. Flood waters covered the tiled floor to a depth of several inches. Clean-up crews were on the job before noon and the hotel was back in business the same day, reflecting the swiftness with which the water dropped.
Hotel Manager George More is seen with some of the boys around 6 a.m. in the Gordon's main beverage room. Flood waters covered the tiled floor to a depth of several inches. Clean-up crews were on the job before noon and the hotel was back in business the same day, reflecting the swiftness with which the water dropped.
Illustration depicts the extent of the Project, from the Kenney Dam and reservoir area to the transmission line and smelter. The future tunnel or the Kemano Completion Project is also included.
Illustration depicts the extent of the Project, from the Kenney Dam and reservoir area to the transmission line and smelter. The future tunnel or the Kemano Completion Project is also included.
Notes
Illustration from Alcan's publication "Kitimat-Kemano, Five Years of Operation, 1954-1959". Alcan Collection
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.
Kitimat was the place to be in North America in the 1950s. The massive Alcan project in the northwest British Columbia was completed in just five years - dam, tunnel, powerhouse, Kemano, transmission line, smelter, and Kitimat. Browse through Kitimat history with these project images - a BC digital collection. The project was one of the most photographed and filmed construction jobs in BC history.