Photo depicts two barges moored in Douglas Channel and loaded with flat-top house sections for construction workers and their families.
Notes
Title based on content of photograph. -- Temporary housing destined for Kitimat was assembled at Vancouver Tug and Barge below the Lion's Gate Bridge in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Pat Jimenez Collection
Photo depicts construction of two pan-abode waiting rooms on the beach at Smeltersite for Pacific Western Airlines. A "Mallard" amphibian airplane unloads on the landing ramp in the background.
Photo depicts construction of two pan-abode waiting rooms on the beach at Smeltersite for Pacific Western Airlines. A "Mallard" amphibian airplane unloads on the landing ramp in the background.
Notes
Pan-Abode is interlocking red cedar building materials invented in 1948 in British Columbia. The builders of Kitimat chose innovative materials such as Pan-Abode for the town. Pan-Abode was used in some of the first prototype homes on Kitimat's first streets - Oriole, Pintail, and Partridge. It is also an efficient building material as a structure can be assembled very quickly. Northern Sentinel Press Collection. P00226.jpg
Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Notes
Title based on content of photograph. -- Slide No. 40 -- The circus tent assembly line was erected at Vancouver Tug and Barge below the Lion's Gate Bridge. Temporary housing destined for Kitimat was assembled there in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Bill Frahler Collection 2003.32
Aerial of Kitimat's office building in the downtown area. The Royal Bank of Canada occupied the main floor, and Property and Power Operations for the Aluminum Company of Canada occupied an upper floor. Kildala Neighbourhood is shown in the background.
Aerial of Kitimat's office building in the downtown area. The Royal Bank of Canada occupied the main floor, and Property and Power Operations for the Aluminum Company of Canada occupied an upper floor. Kildala Neighbourhood is shown in the background.
Notes
Title based on content of photograph. Alcan Collection. Negative found in 2014.14 collection.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Notes
Title based on content of photograph. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.99
Title based on content of photograph. -- Haisla Bridge, Kitimat's first permanent bridge was completed by the end of 1953 and officially opened in 1957. -- The cost was over one million dollars. District of Kitimat Collection. District of Kitimat Collection 987.10.2