Photograph of with the outer housing of the turbine in place, work proceeds with the installation of generator 8 in Alcan's Kemano Powerhouse, which will increase cpacity from the present 784,000 kilowatts to close to 98,000 kilowatts (1,200,000 H.P). The instillation of Generator 8 is being carried out by Mattias & Nicol, general contractors of Vancouver B.C. Employees of Canadian Westinghouse are now on site and are erecting the generator. Work began early in February with completion date for September.
Photograph of with the outer housing of the turbine in place, work proceeds with the installation of generator 8 in Alcan's Kemano Powerhouse, which will increase cpacity from the present 784,000 kilowatts to close to 98,000 kilowatts (1,200,000 H.P). The instillation of Generator 8 is being carried out by Mattias & Nicol, general contractors of Vancouver B.C. Employees of Canadian Westinghouse are now on site and are erecting the generator. Work began early in February with completion date for September.
Photograph of the town of Kemano Powerhouse and Kitimat workers. By 36 member group of the Aluminum extruders council of the U.S and Alcan and Aluminum LTD. Sales representatives 4 of group looking at pelton wheel for generator eight.
Photograph of the town of Kemano Powerhouse and Kitimat workers. By 36 member group of the Aluminum extruders council of the U.S and Alcan and Aluminum LTD. Sales representatives 4 of group looking at pelton wheel for generator eight.
Photograph of the tour of the Kemano powerhouse and Kitimat works by 36 member group of the aluminum extruder council of the US and Alcan and aluminum Ltd. Sales representatives. 4 of group is looking at Delton wheel for generator eight.
Photograph of the tour of the Kemano powerhouse and Kitimat works by 36 member group of the aluminum extruder council of the US and Alcan and aluminum Ltd. Sales representatives. 4 of group is looking at Delton wheel for generator eight.
Photo depicts two men looking up at the bottom bearing bracket for the powerhouse generator. The bracket, manufactured by Canadian General Electric Co., is on a low-boy outside the portal entrance.
Photo depicts two men looking up at the bottom bearing bracket for the powerhouse generator. The bracket, manufactured by Canadian General Electric Co., is on a low-boy outside the portal entrance.
Notes
Title based on content of photograph. -- Alcan ID No. 5793. Alcan Collection
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of looking up Kemano Valley at construction camp for powerhouse.