Photo depicts the aggregate stockpile at Horetzky, being built up to a total of 120,000 cubic yards for the power tunnel lining. View is looking south from the top of the batch plant.
Photo depicts the aggregate stockpile at Horetzky, being built up to a total of 120,000 cubic yards for the power tunnel lining. View is looking south from the top of the batch plant.
Photo depicts the Prepakt aggregate conveyor in foreground during operations at elbow (seen in distance), Elevation 210'. View is looking upstream along No. 2 penstock.
Photo depicts the Prepakt aggregate conveyor in foreground during operations at elbow (seen in distance), Elevation 210'. View is looking upstream along No. 2 penstock.
Notes
Alcan ID no. 5793. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection
Photographs taken by Glyn Jenkins, who worked for Alcan Aluminum Smelter Ltd. in 1952. He returned to Vancouver to continue his education and continued to work in the Steel Fabrication industry until he retired in 1985. He married Charlene Jenkins. Mr. Jenkins died in 2005.
Custodial History
Charlene Jenkins
Scope and Content
Photographs of construction, scenery, housing, and fishing at the Smeltersite, 1952.
Photograph of a splitter operation at Kemano. Steps lead up to a platform, where a man is putting a wooden plank through the machine. Other wooden planks are piled to the right, and a building is to the left. A conveyor is behind. Trees are in the background.
Kemano Timber Limited photos. The President and CEO was Ernest G. McCorkell.
Custodial History
Photos donated by James (Jim) Stewart.
Scope and Content
Photograph of a splitter operation at Kemano. Steps lead up to a platform, where a man is putting a wooden plank through the machine. Other wooden planks are piled to the right, and a building is to the left. A conveyor is behind. Trees are in the background.