Photo depicts four workers on the "Prepakt" intrusion grout pumping jumbo. Insert valves and hoses run from the pumping jumbo.
Notes
Alcan ID no. KR-1476. -- Job occurred over a two-day period, November 23-24, 1953. -- Four holes are pumped simultaneously and average advance of grouting approximately 4' per hour. -- Prepakt aggregate are small rocks poured in around liner. Alcan Collection
Photo depicts the aggregate stockpile at Horetzky, being built up to a total of 120,000 cubic yards for the power tunnel lining. View is looking south from the top of the batch plant.
Photo depicts the aggregate stockpile at Horetzky, being built up to a total of 120,000 cubic yards for the power tunnel lining. View is looking south from the top of the batch plant.
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Photo depicts project management meeting for the symbolic throwing of the switch for tunnel breakthrough. Present from left are Mr. Madsen, M.K. Assistant Project Manager; Mr. Franklin Matthias, Alcan Assistant Project Manager; Mr. Reed, M.K. Area Engineer; Mr. Percy E. Radley, Alcan Project Manager; Mr. Roestad, Alcan Resident Engineer; Mr. Whitey Davis, M.K. General Underground Superintendent; Mr. McNeely Dubose, Alcan Vice President, seen here ready to throw the switch; Mr. V. Rland, M.K Superintendent at Horetzky.
Notes
Alcan ID no. KR-1499. -- M.K. refers to Morrison-Knudsen Company, contractor for the Project. Alcan Collection
Diagram depicts penstock number 1 and 2 showing elevations.
Notes
Penstock No. 2 was completed after the smelter had started aluminum production with Penstock No. 1. -- Tunnel No. 2 with penstocks No. 3 & 4 was the Kemano Completion Project which was cancelled in 1991. Morrison-Knudsen Company Collection
Photo depicts the unlined rock tunnel of horizontal penstock No. 2 at Elevation 210'. View is looking at platform at base of 48 degree inclined raise to 1685' Elevation.
Photo depicts the unlined rock tunnel of horizontal penstock No. 2 at Elevation 210'. View is looking at platform at base of 48 degree inclined raise to 1685' Elevation.
Notes
Alcan ID no. 2KR-10. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection
Photo depicts the Prepakt aggregate conveyor in foreground during operations at elbow (seen in distance), Elevation 210'. View is looking upstream along No. 2 penstock.
Photo depicts the Prepakt aggregate conveyor in foreground during operations at elbow (seen in distance), Elevation 210'. View is looking upstream along No. 2 penstock.
Notes
Alcan ID no. 5793. -- Penstock No. 2 was completed after the smelter had started aluminum production in 1954 with Penstock No. 1. Alcan Collection
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Photo depicts a an International truck heading to Horetzky Creek Camp on the Horetzky Valley Road.
Notes
Morrison-Knudsen Company had several roads such as this one, constructed to get workers and equipment to the various work sites for tunnel construction. 985.65.80
Photo depicts the upper Kemano Valley, Twin Peaks and the Pass as seen overlooking the muck dump area and shop on the 2600' level at the Kemano end of the main power tunnel No. 1 looking North.
Photo depicts the upper Kemano Valley, Twin Peaks and the Pass as seen overlooking the muck dump area and shop on the 2600' level at the Kemano end of the main power tunnel No. 1 looking North.
Notes
Alcan ID no. KR-861. -- Photo taken from the bunkhouse area. Alcan Collection
Photo depicts an International truck heading to Horetzky Creek Camp on the Horetzky Valley Road.
Notes
Morrison-Knudsen Company had several roads such as this one, constructed to get workers and equipment to the various work sites for tunnel construction. 985.65.80